Migrate in a structured way. Operate with confidence.

secunet cloud migrates your workloads from legacy systems in a structured and secure manner to a fully independent infrastructure with server locations in Germany.
syseleven.de has become secunet.cloud. You are already on our new website. The platform, services and contacts remain the same.

A modular end-to-end process

secunet cloud’s cloud migration offering provides companies with a structured and secure way to migrate their workloads from legacy systems (on-premises) and existing cloud environments (multi-cloud) to a sovereign infrastructure with server locations in Germany.

The service is designed as a modular end-to-end process that combines technological expertise with strategic consulting to minimize risks and control costs.

Four Phases Toward the Target Architecture

Each phase has a clear focus—from feasibility to optimized operations.

01 | Assessment

Analysis of the Current Environment

02 | Strategy
Selecting the Migration Method

Focus: Solution Design, Timeline

03 | Migration
Technical Migration of Data and Services

Focus: Minimal Downtime, Secure Transfer Routes

04 | Optimization
Adaptation to the Target Architecture

Focus: Scalability, Performance, Cost Management

What Happens at Each Stage
01 | Assessment

Assessment and Analysis

  • Discovery: Scoping relevant assets—servers, databases, storage—in the legacy environment and existing clouds.
  • Dependency Analysis: Identification of dependencies between applications to form migration groups and avoid outages.
  • Compliance check: Assessment of regulatory requirements, such as GDPR and KRITIS, for data requiring special protection.
  • Cost estimate and proposal: Breakdown of one-time and ongoing costs for the target setup.
02 | Strategy and Design

Planning the Target Architecture

  • Solution Design: Designing the target architecture, selecting suitable products, managed services, and project solutions, as well as planning ongoing operations.
  • Migration Strategy: Determining whether services will be migrated in a “big bang” or in waves, including fallback measures in the event of an interruption.
03 | Migration

Core Operational Process

  • Setup of the Target Environment: Initialization of the new cloud setup with VMs, resources, products, and services.
  • Data Transport: Encrypted transfer of data from the legacy data center or a third-party cloud via secure connections.
  • Tool-Based Replication: Background synchronization to reduce final downtime to just a few minutes.
  • Test Migration: Test runs in the STAG environment for validation under real-world conditions.
  • Cutover: Switching the DNS entries and final go-live in the secunet cloud.
04 | Optimization and Operation

After Migration

  • Right-Sizing: Verifying whether allocated resources such as CPU and RAM are actually needed to avoid overcapacity.
  • Fine-Tuning: Reviewing product and service settings as well as regular backups, optionally including a disaster recovery test.
Contact request

Get started with the secure cloud now

Talk to our experts - initial strategic consultation, technical proof of concept, or migration path.
 

I acknowledge that I have the right to object to the processing of my data at any time, with effect for the future. Further information on the processing of your personal data can be found at: https://www.secunet.cloud/en/privacy-policy.